{"id":4274,"date":"2013-05-07T17:04:39","date_gmt":"2013-05-07T16:04:39","guid":{"rendered":"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?p=4274"},"modified":"2013-05-16T10:45:32","modified_gmt":"2013-05-16T09:45:32","slug":"montrose-turbine-application-rejected","status":"publish","type":"post","link":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?p=4274","title":{"rendered":"Montrose Turbine Application Rejected"},"content":{"rendered":"<div><strong><strong><em><strong>These bulletin blogs represent news about Finavon and the South Esk, and my views as a riparian owner. While I may digress at times to write about other places, these are not the views of any other organisation, nor are they designed to promote the interests of any individual or organisation other than Finavon Castle Water and factors affecting<\/strong><\/em><\/strong><\/strong><em> <\/em><strong><em>the<\/em><\/strong><em> <\/em><strong><strong><em><strong>fishery. Tony Andrews<\/strong><\/em><\/strong><\/strong><\/div>\n<div>\n<figure id=\"attachment_4001\" aria-describedby=\"caption-attachment-4001\" style=\"width: 449px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?attachment_id=4001\" rel=\"attachment wp-att-4001\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4001\" title=\"Both bridges at Spring low tide\" src=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Both-bridges-at-Spring-low-tide.jpg\" alt=\"Both bridges at Spring low tide\" width=\"449\" height=\"300\" srcset=\"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Both-bridges-at-Spring-low-tide.jpg 449w, https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Both-bridges-at-Spring-low-tide-150x100.jpg 150w, https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Both-bridges-at-Spring-low-tide-400x267.jpg 400w\" sizes=\"auto, (max-width: 449px) 85vw, 449px\" \/><\/a><figcaption id=\"caption-attachment-4001\" class=\"wp-caption-text\">Both bridges at Spring low tide<\/figcaption><\/figure>\n<\/div>\n<div>Many people will already know that the application to install 15 turbines under the new road bridge at Montrose has been rejected. The link here explains the reasons for that decision:<br \/>\n<span style=\"font-family: Calibri; font-size: x-small;\"><a href=\"redir.aspx?C=2326163c8dff442ea43ad6a5b4144ab1&amp;URL=http%3a%2f%2fwww.scotland.gov.uk%2fResource%2f0042%2f00421321.pdf\" target=\"_blank\"><span style=\"color: blue;\"><span style=\"text-decoration: underline;\">http:\/\/www.scotland.gov.uk\/Resource\/0042\/00421321.pdf<\/span><\/span><\/a><\/span><\/div>\n<div>\n<p><strong>Here is the decision.<\/strong><\/p>\n<p>Marine Works (Environmental Impact Assessment) Regulations 2007 (Regulation 22)<\/p>\n<p>Environmental Impact Assessment Consent Decisio<\/p>\n<p>Project Title: GSK Montrose Tidal Array<\/p>\n<p>Applicant: GlaxoSmithKline (GSK)<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_4008\" aria-describedby=\"caption-attachment-4008\" style=\"width: 449px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?attachment_id=4008\" rel=\"attachment wp-att-4008\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4008\" title=\"Montrose Turbines site\" src=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Montrose-Turbines-site2.jpg\" alt=\"Montrose Turbines site\" width=\"449\" height=\"300\" \/><\/a><figcaption id=\"caption-attachment-4008\" class=\"wp-caption-text\">Montrose Turbines site<\/figcaption><\/figure>\n<p><strong>Location: River South Esk Estuary, Montrose<\/strong><\/p>\n<p>1. Introduction<\/p>\n<p>This document constitutes an environmental impact assessment (EIA) consent decision<br \/>\nunder regulation 22 of the Marine Works (Environmental Impact assessment) Regulations<br \/>\n2007 (MWR) (as amended) (MWR), in respect of an application which has been submitted<br \/>\nby GSK to:<\/p>\n<p>Marine Scotland, the licensing authority on behalf of the Scottish Ministers, for a Marine<br \/>\nLicence under the Marine (Scotland) Act 2010.<\/p>\n<p>The works described in this application comprises a project listed at Annex ll of the Directive<br \/>\n85\/337\/EEC on the assessment of the effects of certain public and private projects on the<br \/>\nenvironment (EIA Directive). The EIA Directive has been transposed into UK law for marine<br \/>\nworks (including works requiring a marine licence) by the MWR. The project in this instance<br \/>\ncomprises the marine elements of the GSK Tidal Array Project, Montrose.<\/p>\n<p>Marine Scotland screened the project in accordance with Regulations 8 and 11 of the MWR<br \/>\nand determined an EIA was necessary. (The proposed development was below the 1MW<br \/>\nthreshold which usually triggers the requirement for an EIA for a marine renewable energy<br \/>\nproject but was in a particularly sensitive location.) The application made to Marine Scotland<br \/>\nwas then supported by an environmental statement (ES) and additional supporting<br \/>\ninformation as required by regulation 12 of the MWR.<\/p>\n<figure id=\"attachment_3998\" aria-describedby=\"caption-attachment-3998\" style=\"width: 449px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?attachment_id=3998\" rel=\"attachment wp-att-3998\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3998\" title=\"Montrose Basin from South side\" src=\"http:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Montrose-Basin-from-South-side.jpg\" alt=\"Montrose Basin from South side\" width=\"449\" height=\"300\" srcset=\"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Montrose-Basin-from-South-side.jpg 449w, https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Montrose-Basin-from-South-side-150x100.jpg 150w, https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/wp-content\/uploads\/2013\/03\/Montrose-Basin-from-South-side-400x267.jpg 400w\" sizes=\"auto, (max-width: 449px) 85vw, 449px\" \/><\/a><figcaption id=\"caption-attachment-3998\" class=\"wp-caption-text\">Montrose Basin from South side<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>2. Project Description<\/p>\n<p>The project comprised 15 tidal turbines with gravity foundations to be placed either side of<br \/>\nthe road bridge at Montrose. These would transmit energy to the shore where they would be<br \/>\nconnected to a shore station. The power would be transmitted to the GSK Montrose plant. It<br \/>\nwas proposed that the array would be installed in 2 phases with a total capacity of up to<br \/>\n0.7MW<br \/>\n3. The Environmental Statement<\/p>\n<p>The principal potential impacts identified and discussed in the ES were:<\/p>\n<p>\u2022 Archaeology &amp; cultural heritage<\/p>\n<p>\u2022 Seabed ecology<\/p>\n<p>\u2022 ornithology<\/p>\n<p>\u2022 coastal &amp; sedimentary geology processes<\/p>\n<p>\u2022 fish &amp; shellfish<\/p>\n<p>\u2022 marine mammals<\/p>\n<p>\u2022 marine navigation<\/p>\n<p>\u2022 onshore noise &amp; vibration<\/p>\n<p>\u2022 onshore traffic &amp; transport<\/p>\n<p>\u2022 other sea &amp; land users<\/p>\n<p>\u2022 terrestrial geology, hydrology &amp; hydrogeology<\/p>\n<p>\u2022 terrestrial habitats &amp; ecology<\/p>\n<p>\u2022 landscape, seascape and visual impact<\/p>\n<p><strong>3.1 Environmental sensitivities<\/strong><\/p>\n<p>The site of the proposal is environmentally sensitive. The Montrose Basin has international<br \/>\ndesignations as a Special Protection Area (SPA) and Ramsar site and is also a Site of<br \/>\nSpecial Scientific Interest (SSSI) and Local Nature Reserve. In addition the River South Esk<br \/>\nis designated as a Special Area of Conservation (SAC), with Atlantic salmon and Freshwater<br \/>\nPearl as the qualifying features. There is also evidence that animals from adjacent protected<br \/>\nareas use the Montrose Basin e.g. harbour seals from the Tay and Eden Estuary SAC.<\/p>\n<p><strong>3.2 The appropriate assessment<\/strong><\/p>\n<p>The proposed works did require an appropriate assessment under Section 48 of the<br \/>\nConservation (Natural habitats, &amp;c.) Regulations 1994. The appropriate assessment made<br \/>\nthe following conclusion: \u201cThe location of the proposed development is characteristic in<br \/>\nhaving a unique set of environmental and geographic conditions that are combined with<br \/>\npotentially highly sensitive receptors. In light of the assessment Marine Scotland conclude<br \/>\nthere is insufficient information to ascertain that the development will not have an adverse<br \/>\neffect on the integrity of the South Esk SAC, the Firth of Tay and Eden Estuary SAC and the<br \/>\nMontrose Basin SPA.\u201d<\/p>\n<p><strong>4. Consultation<\/strong><\/p>\n<p>This section summaries the project consultation undertaken by Marine Scotland in 2012<\/p>\n<p><strong>4.1 Public consultation<\/strong><\/p>\n<p>In accordance with Regulation 16 (1) (b) of the MWR Marine Scotland instructed GSK to<br \/>\nplace a public notice for two successive weeks. The public notice contained details of:<\/p>\n<p>\u2022 the applicant&#8217;s name and address<\/p>\n<p>\u2022 that an application had been made under the MWR and Part 4 of the Marine (Scotland) Act 2010<\/p>\n<p>\u2022 a statement of the nature and location of the project<br \/>\n\u2022 the address details of where the application and ES could be inspected during office<br \/>\nhours<\/p>\n<p>\u2022 notice that parties could make such requests and representations within 42 days of<br \/>\nthe first notice date<\/p>\n<p>The public notice appeared in The Courier (14th &amp; 21st March), The Montrose Review (15th &amp;<br \/>\n27th March) and the Edinburgh Gazette (16th &amp; 20th March)<\/p>\n<p>Marine Scotland received 13 public representations objecting to the application. The<br \/>\nobjections were mainly based on the potential impacts of the project on wildlife (particularly<br \/>\neider ducks, harbour seals and salmon), and the possibility that the turbines could affect<br \/>\ncoastal processes and impact sediments of the Montrose Basin. There were also concerns<br \/>\nthat the development could interfere with activities of the Montrose Sailing Club and pose a<br \/>\nsafety threat to sailors.<\/p>\n<p><strong>4.2 Consultees<\/strong><\/p>\n<p>As part of the consideration of the application and ES, Marine Scotland conducted a<br \/>\nconsultation with advisory and regulatory bodies for comment on the validity of the ES<br \/>\ndocument and the conclusions of environmental impact drawn. The consultation opened on<br \/>\n16th March 2012 and closed on the 13th April 2012.<\/p>\n<p><strong>4.2.1 Consultee List<\/strong><\/p>\n<p>Angus Council<\/p>\n<p>Association of Salmon Fishery Boards<\/p>\n<p>BT<\/p>\n<p>Crown Estate<\/p>\n<p>Esk District salmon Fishery Board<\/p>\n<p>Health and Safety Executive<\/p>\n<p>Historic Scotland<\/p>\n<p>Inshore Fisheries Group<\/p>\n<p>Joint Radio Company<\/p>\n<p>Marine Safety Forum<\/p>\n<p>Marine Scotland Compliance<\/p>\n<p>Marine Scotland Science<\/p>\n<p>Maritime and Coastguard Agency<\/p>\n<p>Ministry of Defence<\/p>\n<p>Montrose Harbour<\/p>\n<p>Montrose Sailing Club<\/p>\n<p>Northern Lighthouse Board<\/p>\n<p>Ports and harbours<\/p>\n<p>Royal Yachting Association (Scotland)<\/p>\n<p>RSPB<\/p>\n<p>Scottish Canoe Association<\/p>\n<p>Scottish Fishermans Federation<\/p>\n<p>Scottish Fishermans Organisation<\/p>\n<p>Scottish Wildlife Trust<\/p>\n<p>Scottish Government Planning<\/p>\n<p>SEPA<br \/>\nSNH<\/p>\n<p>Transport Scotland<\/p>\n<p>Whale and Dolphin Conservation Society<\/p>\n<p><strong>4.2.2 Consultee Responses<\/strong><\/p>\n<p><strong>Angus Council<\/strong><\/p>\n<p>In conclusion the proposal is a relatively untested technology in a very environmentally<br \/>\nsensitive location, as evidenced by the range of designations associated with Montrose<br \/>\nBasin and the River South Esk and the protected species. Montrose Bridge and Wharf Street<br \/>\nare also important in townscape terms being the southern entry to the main part of Montrose<br \/>\nand also providing public overview of the river\/estuary at this part of the town. Based on the<br \/>\ninformation presented a number of matters remain unresolved or at best inconclusive. It is<br \/>\nclear that there will be at least a moderate impact and in some cases major impact (Atlantic<br \/>\nsalmon) on several protected species and habitats and that only through deployment and<br \/>\nmonitoring of the first phase, would the various study assumptions and conclusions on<br \/>\nimpact of the project on the environment be tested and possibly affirmed. Suggested<br \/>\nmeasures of mitigation are at this stage unproven. It is certainly not clear that the proposal in<br \/>\nthe round can demonstrate compliance with the three tests relating to the implementation of<br \/>\nEC Directive 92\/43 \u2013 The Habitats Directive.<\/p>\n<p>The positioning of the array, taking up more than half of the width of the channel, will affect<br \/>\nthe travel route for several species and because of uncertainty of impact it seems that there<br \/>\nis a need for further baseline data (before any works are undertaken) to better understand<br \/>\nnumbers and movements of protected species and the overall effect of the array. Only if the<br \/>\nrelevant agencies are agreed that the baseline data concludes that there would be no<br \/>\nsignificant affect on the designated interests (species and habitats) should the first phase be<br \/>\nconstructed.<\/p>\n<p>In relation to noise impact there is no agreed position between the Council and applicant with<br \/>\nregard to baseline information, methodology and outcomes. Chapter 17 should be revisited.<br \/>\nAt the very least some discussions between the various parties should be held and if<br \/>\nrequired additional noise analysis etc undertaken before agreement is given to proceed on<br \/>\nsite with the first phase.<\/p>\n<p>With regard to visual impact on designated sites (Montrose conservation area and listed<br \/>\nbuildings) and on the amenity of residents in the immediate area\/frontage buildings no<br \/>\nevidence has been presented that the potential impact is acceptable. The scale of what will<br \/>\nbe visible in the water and over what length of time only adds to the uncertainty of impact.<br \/>\nNone of the visualisations attempt to address this aspect with Wharf Street as the backdrop.<br \/>\nThe lack of clear information on water height tides and what will be visible over what length<br \/>\nof time and how this affects the built heritage needs to be addressed.<\/p>\n<p>Chapter 23 of the ES sets out the summary of project commitments by chapter and also a<br \/>\ncommitment to develop an appropriate monitoring and reporting programme. An indication of<br \/>\nthis is given in sections 23.11 &#8211; 23.66. However in the event that phase1 is given the go<br \/>\nahead further survey work (agreed by relevant agencies) should be gathered for a full year,<br \/>\npreferably two years, to fully understand the effects of the first phase of the turbines. If there<br \/>\nis an adverse affect they should be removed. Only if there has been no adverse effect<br \/>\nshould the second phase be installed. A further monitoring scheme for 1 &#8211; 2 years should be<br \/>\nundertaken, with further monitoring every five years. This would require agreement by the<br \/>\nvarious agencies on the monitoring measures and values.<br \/>\nIt is therefore imperative that all the necessary survey\/baseline information is<br \/>\ngathered\/available before any structures are in place. This would enable a full understanding<br \/>\nand evaluation of impact to be determined. The Council would wish to be fully satisfied that<br \/>\nrelevant agencies have agreed the monitoring regime\/timescales etc and only where a full<br \/>\nevaluation of any first phase demonstrated that there was no adverse impact on affected<br \/>\nspecies would a second phase be approved.<\/p>\n<p><strong>Association of Salmon Fishery Boards<\/strong><\/p>\n<p>Objection<\/p>\n<p>ASFB recognises the importance of marine renewable energy. However, the environmental<br \/>\nimpact assessment has failed to demonstrate that the development will not adversely affect<br \/>\nthe integrity of the River South Esk SAC. Where a Natura site is involved, the onus is on the<br \/>\ndeveloper to demonstrate no impact and in the absence of that the precautionary principle<br \/>\nwill apply. Under these circumstances, we do not believe that the proposed staged<br \/>\nimplementation is compatible with the requirements of the Habitats Directive. On that basis,<br \/>\nwe have no alternative but to formally object to the proposed development..<\/p>\n<p><strong>BT<\/strong><\/p>\n<p><strong>Crown Estate<\/strong><\/p>\n<p><strong>Esk District salmon Fishery Board<\/strong><\/p>\n<p>Objection<\/p>\n<p>The Esk Board recognises the importance of the project but in view of its statutory<br \/>\nresponsibilities cannot support the introduction of the tidal array on the basis of the current<br \/>\nenvironmental impact assessment and wishes to lodge an objection for the following<br \/>\nreasons:<\/p>\n<p>\u2022 There are many gaps in the information which makes it often impossible to conclude<br \/>\nthat there will be no significant effect on fish species<\/p>\n<p>\u2022 The work referred to in the Bay of Fundy and elsewhere would seem to contradict the<br \/>\nrisk assessment to fish species through collision as presented in the ES<\/p>\n<p>\u2022 The requirements of the Habitats Directive require a clear indication the there are no<br \/>\nsignificant risks prior to the implementation of the project. Under these circumstances<br \/>\na staged implementation with additional monitoring to ascertain likely effects is not<br \/>\npermissible<\/p>\n<p><strong>Health and Safety Executive<\/strong><\/p>\n<p><strong>Historic Scotland<\/strong><\/p>\n<p>No objection, agree with the findings of the ES that impacts on nationally important historic<br \/>\nenvironmental assets are unlikely to be significant.<\/p>\n<p><strong>Joint Radio Company<\/strong><\/p>\n<p><strong>Marine Scotland Compliance<\/strong><br \/>\n<strong>Marine Scotland Science<\/strong><\/p>\n<p>\u2022 Spring salmon stocks in South Esk would have limited capacity to absorb additional mortality.<\/p>\n<p>\u2022 Since the mid 1990s there has been a marked decline in sea trout numbers,<br \/>\nadditional mortality would be undesirable.<\/p>\n<p>\u2022 There is a need for much clearer and considered ES.<\/p>\n<p>\u2022 The ES is not well supported by literature.<\/p>\n<p>\u2022 The ES does not deal with effects on different life cycle stages of diadramous fish<br \/>\nspecies concerned.<\/p>\n<p>\u2022 There is a lack of recent baseline information on the seabed and bathymetry of the<br \/>\nMontrose Basin.<\/p>\n<p>\u2022 It is considered likely that sedimentary processes would be slow to respond to the<br \/>\nturbine operation and monitoring between installation phases may not detect change.<\/p>\n<p>\u2022 The purpose of the 2D hydrodynamic modelling is not clear.<\/p>\n<p>\u2022 There is no evidence to show which marine fish species are present.<\/p>\n<p>\u2022 If sandeels are present there would be concern over possible sediment changes.<\/p>\n<p><strong>Maritime and Coastguard Agency<\/strong><\/p>\n<p>Objection:<\/p>\n<p>\u2022 Turbines positioned close to the small boat channel introduces risk, especially<br \/>\ntodrifting vessels.<\/p>\n<p>\u2022 Lighting and marking requirements need to be agreed with MCA and NLB if licence<br \/>\ngranted<\/p>\n<p>\u2022 Limited 0.5m clearance during operation leaves no margin for error.<\/p>\n<p>\u2022 These points would need to be addressed in ports Emergency Response Plan<\/p>\n<p><strong>Ministry of Defence<\/strong><\/p>\n<p><strong>Montrose Sailing Club<\/strong><\/p>\n<p>Objection<\/p>\n<p>We feel that this proposal would represent a risk to the safety of our members, as the<br \/>\nproposed mitigation measures are inadequate. The effective loss of navigational rights and<br \/>\nsailing amenity resulting from the closure of the central span of the road bridge are also of<br \/>\nsignificant concern to the Club. We consider that the possibility of changes to the<br \/>\nsedimentation patterns within the Basin has not been considered by the applicant, and that<br \/>\nthese may further restrict our sailing area in the future. Finally, even if the proposal were to<br \/>\ngo ahead with suitable safety mitigation measures, the turbines could be perceived as a<br \/>\nsignificant safety risk by prospective members who would then look elsewhere or take-up a<br \/>\ndifferent sport. For these outline reasons, the General Committee of Montrose Sailing Club<br \/>\nfeel the proposal is detrimental to the long term viability of the Club.<\/p>\n<p><strong>Northern Lighthouse Board<\/strong><\/p>\n<p>\u2022 All reasonable risks have been addressed in NRA.<\/p>\n<p>\u2022 During all phases notice to mariners will be required.<\/p>\n<p>\u2022 During operation condition of devices should be monitored and contingency plan for<br \/>\nfailures.<\/p>\n<p>\u2022 The applicant must adhere to all marking and lighting recommended by the NLB.<\/p>\n<p><strong>Ports and harbours<\/strong><\/p>\n<p><strong>Royal Yachting Association (Scotland)<\/strong><\/p>\n<p><strong><\/strong><br \/>\n\u2022 The RYA position statement recommends minimum clearance of 2m for dinghies.<\/p>\n<p>\u2022 The risk assessment did not consider worst credible accidents.<\/p>\n<p>\u2022 Consideration should be give to the time taken to stop blades if collision with a<br \/>\nperson.<\/p>\n<p>\u2022 Warning signs cannot be seen as mitigation for drifting vessels.<\/p>\n<p><strong>RSPB<\/strong><\/p>\n<p>Objection<\/p>\n<p>As the proposed development, which is unconnected with site management for nature<br \/>\nconservation, is likely to significantly effect the Montrose Basin SPA, the Conservation<br \/>\n(Natural Habitats, &amp;c) Regulations 1994 (as amended) (the \u2018Habitats Regulations\u2019) apply and<br \/>\nthe competent authority must carry out an appropriate assessment in view of the SPA\u2019s<br \/>\nconservation objectives to determine whether or not the development will adversely affect<br \/>\nthe integrity of the site. RSPB Scotland considers that the Environmental Statement (ES)<br \/>\ndoes not, in terms of survey effort or data analysis, make a competent assessment of the<br \/>\nlikely impacts of the proposal on the Montrose Basin SPA. Further, we believe that the ES<br \/>\ndoes not contain sufficient information to allow Marine Scotland, as competent authority, to<br \/>\ncarry out the necessary Appropriate Assessment.<\/p>\n<p>We do not consider that the proposal has met the requirements of the Regulations since it<br \/>\nhas failed to show, beyond reasonable scientific doubt, that there will not be an adverse<br \/>\nimpact on the integrity of the SPA. In this situation, the competent authority must take a<br \/>\nprecautionary approach. The proposal can therefore only proceed if there are no alternative<br \/>\nsolutions and if there are overriding reasons of public interest, neither of which is<br \/>\ndemonstrated in the ES.<\/p>\n<p><strong>Scottish Canoe Association<\/strong><\/p>\n<p>\u2022 This section of harbour is not extensively used by kayakers but it is possible.<\/p>\n<p>\u2022 The array could present a possible hazard at low tide.<\/p>\n<p>\u2022 Mitigation is suggested by way of clear warning signs.<\/p>\n<p><strong>Scottish Fishermans Federation<\/strong><\/p>\n<p><strong>Scottish Wildlife Trust<\/strong><\/p>\n<p>Objection<\/p>\n<p>It would be highly inappropriate for Marine Scotland to consent the deployment of<br \/>\n\u201cembryonic technology\u201d in this location. We wish to register our objection to the proposed<br \/>\ndevelopment on the grounds that we do not believe it is possible for Marine Scotland to rule<br \/>\nout adverse effects on protected species and habitats.<\/p>\n<p><strong>Scottish Government Planning<\/strong><\/p>\n<p>No Comments<\/p>\n<p><strong>SEPA<\/strong><\/p>\n<p>\u2022 Reasonable likelihood that the conditions for derogation under the Water Framework<br \/>\nDirective will not be met.<\/p>\n<p>\u2022 More information required on scour works, dredging, model calibration and validation,<br \/>\nmarine non-native species, noise and piling activity<\/p>\n<p>\u2022 Evidence required that fish will be able to migrate.<br \/>\n<strong>SNH<\/strong><\/p>\n<p>Objection<\/p>\n<p>Based on information available and our own appraisal, we consider it cannot be concluded<br \/>\nthat there will not be an adverse effect on site integrity to the River South Esk SAC, the Firth<br \/>\nof Tay and Eden Estuary SAC, and the Montrose Basin SPA and Ramsar site. Even with the<br \/>\nphased deployment and monitoring approach, our concerns remain due to insufficient time<br \/>\nand methods to collect robust evidence. Furthermore, we have serious concerns regarding<br \/>\nthe potential impacts to other nationally important natural heritage features in the area.<\/p>\n<p><strong>Transport Scotland<\/strong><\/p>\n<p>Minimal Environmental Impact on trunk road network<\/p>\n<p><strong>Whale and Dolphin Conservation Society<\/strong><\/p>\n<p>Objection<\/p>\n<p>The Environmental Statement has failed to show, beyond reasonable scientific doubt, that<br \/>\nthere will not be an adverse impact on the integrity of the Firth of Tay and Eden Estuary<br \/>\nSAC.<\/p>\n<p>WDCS, IAR, BDMLR and OneKind do not believe that it is possible to rule out adverse<br \/>\neffects on the very small and rapidly declining harbour seal population based on the level of<br \/>\nrisk and uncertainty surrounding the effectiveness of monitoring and mitigation measures<br \/>\nproposed and cumulative impacts. As a result, we submit a formal objection to this proposal.<\/p>\n<p><strong>5. Conditions<\/strong><\/p>\n<p>Not applicable<\/p>\n<p><strong>6. Regulatory Evaluation<\/strong><\/p>\n<p><strong>6.1 Conclusions<\/strong><\/p>\n<p>In considering the application, in particular the ES, responses to the consultation and the<br \/>\nrelevant provisions of the Marine (Scotland) Act 2010, a full and detailed assessment has not<br \/>\nbeen made of the potential direct and indirect effects of the proposal. The application<br \/>\nreceived 7 objections from consultees with others raising serious concerns. Thirteen<br \/>\nobjections were also received from the public.<\/p>\n<p>Marine Scotland, as the regulator, are not satisfied with the findings of the ES, and are of the<br \/>\nopinion that the marine elements of the project will have a significant adverse effect on the<br \/>\nenvironment. The appropriate assessment also concluded that there is insufficient<br \/>\ninformation to ascertain that the development will not have an adverse effect on the integrity<br \/>\nof the South Esk SAC, the Firth of Tay and Eden Estuary SAC and the Montrose Basin SPA.<\/p>\n<p><strong>6.2 Recommendations<\/strong><\/p>\n<p>Having carried out assessments of the potential environmental impacts of the proposed<br \/>\nproject, the reviewer acting on behalf of Marine Scotland makes the recommendations<br \/>\nbelow: Marine Scotland are not satisfied that the ES adequately addresses all environmental issues<br \/>\nin relation to the GSK Montrose Tidal Array development and compliance with the Habitats<br \/>\nRegulations has not been demonstrated. Therefore this application for a Marine Licence<br \/>\nmust be refused under section 24 (b) of the MWR.<\/p>\n<p>Reviewed by:<\/p>\n<p>Gayle Holland<\/p>\n<p>Date: 7th February 2013<\/p>\n<p>Approved by Roger May<\/p>\n<p>Date 18th March 2013<\/p>\n<p>The Licensing Authority:<\/p>\n<p>Marine Scotland<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>From: Roger May<\/p>\n<p>Marine Scotland Licensing Operations Team<\/p>\n<p>Marine Renewable Energy Development<\/p>\n<p>February 2013<\/p>\n<p>&nbsp;<\/p>\n<p>Cabinet Secretary for Rural Affairs and the Environment<\/p>\n<p>&nbsp;<\/p>\n<p>APPLICATION FOR A MARINE LICENCE UNDER PART 4, SECTION 20 OF THE<br \/>\nMARINE (SCOTLAND) ACT 2010 TO CONSTRUCT AND OPERATE A TIDAL ARRAY IN<br \/>\nTHE RIVER SOUTH ESK BETWEEN MONTROSE BASIN AND MONTROSE HARBOUR.<\/p>\n<p><strong>Purpose<\/strong><\/p>\n<p>To seek your determination on the application by GlaxoSmithKline, Montrose to construct and<br \/>\noperate a tidal array in the River South Esk Estuary of up to 0.7 MW.<\/p>\n<p>Priority &#8211; Routine.<\/p>\n<p><strong>Background<\/strong><\/p>\n<p>GlaxoSmithKline (GSK) submitted a marine licence application to Marine Scotland Licensing<br \/>\nOperations Team (MS-LOT) on 30 January 2012 to develop a tidal array in the River South Esk<br \/>\nEstuary. The array would make a small contribution to the renewables obligation and climate change<br \/>\ntargets in Scotland. If consented, it would provide energy direct to the GSK Montrose site &#8211; supplying<br \/>\n7 % of the site\u2019s needs.<\/p>\n<p>Turbines would be deployed on the river bed either side of the road bridge at Montrose in 2 phases<br \/>\nover 14 months- comprising a total of 15 tidal turbines.<\/p>\n<p>The proposed development site is environmentally sensitive affecting 3 Natura Sites (these are sites of<br \/>\nEuropean Community importance which are designated as such by Member States for the purpose of<br \/>\nprotecting natural habitats and species of Community interest under both the Habitats Directive and<br \/>\nthe Wild Birds Directive):<\/p>\n<p>&nbsp;<\/p>\n<p><strong>1. River South Esk SAC<\/strong><\/p>\n<p><strong>2. Montrose Basin SPA<\/strong><\/p>\n<p><strong>3. Firth of Tay and Eden Estuary SAC.<\/strong><\/p>\n<p>Given the sensitive nature of the location1, GSK undertook an Environmental Impact Assessment<br \/>\n(EIA) &#8211; the application was also accompanied by an Environmental Statement (ES). These are usually<br \/>\nonly required where the power generated will exceed 1 MW.<\/p>\n<p>Consultation on marine licence applications which is a statutory requirement under section 27 of the<br \/>\nMarine (Scotland) Act 20102 (\u2018the 2010 Act\u2019) remains a critical component of the licensing process.<br \/>\nThe public consultation ended in March 2012 \u2013 MS-LOT received a total of 20 objections. These<br \/>\nincluded from SNH, Association of Salmon Fishery Boards, RSPB, Scottish Wildlife Trust, Whale<br \/>\nand Dolphin Conservation Society, Esk District Salmon Fishery Board and the Montrose Sailing Club.<br \/>\nIn addition, 13 objections were from members of the public. In order to inform the licence<\/p>\n<p>1 Further details of proposed location are contained in the Annex B, Para 2d<\/p>\n<p>2 Relevant legal tests to consider when determining marine licence applications \u2013<\/p>\n<p>Annex A<br \/>\ndetermination process, there have been further discussions with consultees including exchanges of<br \/>\ncorrespondence and meetings as required.<\/p>\n<p>The objections were mainly based on the potential impacts of the project to wildlife (particularly eider<br \/>\nducks, harbour seals, and salmon), and the possibility that the turbines could affect coastal process and<br \/>\nimpact sediments of the Montrose Basin. It was recognised by SNH and MS-LOT that the consent of<br \/>\nthe proposal, as presented, was unlikely to satisfy relevant statutory tests nor comply with the Habitats<br \/>\nDirective and Regulations. The Montrose Sailing club also raised safety issues and concerns that the<br \/>\nturbines could interfere with club activities.<\/p>\n<p>Throughout the Marine Licence process MS-LOT continued close engagement with GSK \u2013 advising<br \/>\nthem of the terms of the objections received and gave them an opportunity to make representations on<br \/>\nthe observations received, as is required by section 27(5) of the 2010 Act.<\/p>\n<p>GSK submitted further information in response which included additional monitoring. These<br \/>\nproposals were reviewed by SNH and Marine Scotland Science, however, MS-LOT have not received<br \/>\nthe necessary reassurance from the applicant or from other correspondents that there would be no<br \/>\nadverse impact upon the integrity of the protected sites if the project was to be taken forward, as<br \/>\nproposed.<\/p>\n<p>GSK employed RPS Energy (Environmental Consultants) to conduct an independent review of the<br \/>\nES. RPS concluded that further work was necessary to mitigate for likely significant impacts on the<br \/>\nNatura Sites. Marine Scotland and SNH met with RPS and GSK on the 5\/11\/2012 to review the<br \/>\nreport. Marine Scotland met with GSK on the 7\/11\/2012 to provide feedback on the report and<br \/>\nbriefed GSK on the likely findings of an Appropriate Assessment. Marine Scotland noted the<br \/>\nproposed further works but did not feel that they would provide sufficient information to alter the<br \/>\nnegative conclusions of an Appropriate Assessment or identify mitigation methods to reduce any<br \/>\nimpacts to an acceptable level. Marine Scotland also reviewed the potential for other technologies at<br \/>\nthis site and concluded that until further information on actual impacts from these technologies was<br \/>\navailable that it was unlikely that any other device could be deployed at this site without impacting on<br \/>\nthe qualifying interest of the Natura sites. Marine Scotland recommended generating from renewable<br \/>\nsources at other sites, feeding the electricity generated into the grid and offsetting this against the<br \/>\npower used by the company at the Montrose facility.<\/p>\n<p>Marine Scotland reviewed RPS\u2019s report and carried out, in line with the Habitats Directive and<br \/>\nRegulations, an Appropriate Assessment (Annex B) of the potential impacts on the Natura sites which<br \/>\nwas agreed with SNH. The results of the Appropriate Assessment are that adverse impact on site<br \/>\nintegrity cannot be ruled out for all 3 Natura Sites if the proposal is approved.<\/p>\n<p>All representations that have been received by Marine Scotland in connection with the licence<br \/>\napplication must, in terms of section 27(6) of the 2010 Act, be taken into account by you when<br \/>\ndetermining the application.<\/p>\n<p><strong>Options<\/strong><\/p>\n<p>\u2022<strong> (Option 1<\/strong>) Under section 28 of the Marine (Scotland) Act 2010 you can call a Public Local<br \/>\nInquiry (PLI). Having considered all the representations and all other material considerations,<br \/>\nit is considered that it is not appropriate to cause a PLI to be held in this case. It is considered<br \/>\nthat you are properly able to weigh up all the conflicting issues without needing to hold an<br \/>\ninquiry.<br \/>\n\u2022 <strong>(Option 2)<\/strong> If in respect of the application it is considered by you that the statutory tests under<br \/>\nthe 2010 Act are satisfied, and if it is shown that the approval of the proposal would not<br \/>\ncontravene EU law (ie the proposal would either not adversely affect the integrity of the<br \/>\nNatura sites or it would adversely affect the sites but there are considerations of overriding<br \/>\npublic interest which justify the taking forward of the project notwithstanding the negative<br \/>\nimplications) you may then grant a licence with or without conditions under section 29 of The<br \/>\nMarine (Scotland) Act 2010. In this case it is considered that this is not an option.<\/p>\n<p>\u2022<strong> (Option 3)<\/strong> You can refuse the application for a licence under section 29 of the 2010 Act<br \/>\nwhere, on the basis of all of the evidence presented in connection with the application, you<br \/>\nconsider that the legal tests (as set out above, below and in Annex A) are not satisfied.<br \/>\nMSLOT have a strong track record in issuing informed marine licence decisions based on due<br \/>\nprocess, sound science and expert judgement. Under the Habitats Regulations you have a<br \/>\ngeneral duty when exercising your functions to have regard to the requirements of the Habitats<br \/>\nDirective and the Wild Birds Directive. On the information provided given the very clear<br \/>\npossibility and risk of significant and unacceptable impacts resulting from the licence<br \/>\napplication being granted in an environmentally sensitive area it is our judgement and<br \/>\nrecommendation that this licence application should be refused.<\/p>\n<p>It is considered that the legal tests in the case have not been met. On the basis of all of the<br \/>\ninformation available it is considered that you cannot ascertain with certainty that the proposal will<br \/>\nnot have any significant adverse impacts on the environment (which in this case is highly sensitive<br \/>\nand of high value and, as such, is protected by measures taken under European law) and the local<br \/>\namenity.<\/p>\n<p>Furthermore, it is considered from the information available that you may be satisfied that no suitable<br \/>\nprevention, mitigation or compensation measures can be put in place. There are no imperative reasons<br \/>\nof overriding public interest in the case which justify the taking forward of the proposal<br \/>\nnotwithstanding the negative implications.<\/p>\n<p>To grant the licence application would contravene EU law. By section 29(6) of the 2010 Act you are<br \/>\nnot permitted to grant a licence where to do so would contravene international law.<\/p>\n<p>In terms of the 2010 Act and the Marine Licensing Appeals (Scotland) Regulations 2011 it will be<br \/>\npossible for GSK to appeal to the sheriff court against any decision to refuse the licence application.<br \/>\nOn determining an appeal the sheriff may dismiss the appeal or allow the appeal and quash the<br \/>\ndecision in whole or in part.<\/p>\n<p>It is considered that there are good grounds for refusing the marine licence application in this case.<\/p>\n<p>The case has been referred to SGLD for advice\/comment before being passed to you.<\/p>\n<p><strong>Recommendation<\/strong><\/p>\n<p>Following a thorough examination of the GSK marine licence application MS-LOT<br \/>\nrecommend that you refuse the application.<\/p>\n<p>On the basis of all of the evidence that has been presented in connection with the licence<br \/>\napplication it is considered that the legal tests which are set out within sections 3 and 27 of the<br \/>\n2010 Act and article 6 of the Habitats Directive and regulations 48 and 49 of the Habitats<br \/>\nRegulations which must all be satisfied before the marine licence application may lawfully be<br \/>\napproved in this case are not met.<br \/>\nThe environment in this case is highly sensitive and of high value and as such protected by<br \/>\nmeasures taken under European law. An appropriate assessment has been undertaken in<br \/>\nconnection with the proposal as is required by Article 6(3) of the Habitats Directive and regulation<br \/>\n48 of the Habitats Regulations. The assessment, a copy of which has been provided to the<br \/>\napplicant, concludes that there is insufficient information to ascertain that the development will<br \/>\nnot have an adverse effect on the integrity of the 3 Natura sites which are located nearby the site<br \/>\nfor the proposal.<\/p>\n<p>Given the terms of the information that has been made available to you, particularly the terms of<br \/>\nthe appropriate assessment, all of which the applicant has, in terms of the 2010 Act, been given an<br \/>\nopportunity to address and comment upon to you, it is considered that you cannot ascertain with<br \/>\ncertainty that the proposal will not have a significant adverse impact on the environment and the<br \/>\nlocal amenity.<\/p>\n<p>It has not been shown that any suitable prevention, mitigation or compensation measures can be<br \/>\nput in place to allow the proposal to proceed notwithstanding the negative implications. Nor has it<br \/>\nbeen shown that it would be possible to attach conditions to the grant of a licence in order to<br \/>\nsatisfy the legal tests.<\/p>\n<p>In the circumstances of the case, as narrated, to grant the licence application would contravene EU<br \/>\nlaw. The Marine (Scotland) Act 2010 prohibits you from granting a licence authorising activity<br \/>\nwhich is contrary to international law.<\/p>\n<p>Subject to your agreement, in line with the legislation and consistent with the treatment of other<br \/>\nMarine Licence applications &#8211; the refusal of this licence will be made available on the Scottish<br \/>\nGovernment website.<\/p>\n<p>Roger May<\/p>\n<p>45473<\/p>\n<p>Annex A<\/p>\n<p>Relevant legal tests to consider when determining marine licence applications<\/p>\n<p><strong>Marine (Scotland) Act 2010<\/strong><\/p>\n<p>By section 3 of the 2010 Act when exercising any function that affects the Scottish marine area (this<br \/>\nincludes the determination of marine licence applications) you have a general duty to act in the way<br \/>\nbest calculated to further the achievement of sustainable development, including the protection and,<br \/>\nwhere appropriate, the enhancement of the health of the area.<\/p>\n<p>Under section 4 of the 2010 Act when exercising any function that affects the Scottish marine area<br \/>\neither under that Act, the Climate Change (Scotland) Act 2009 or any other Act you must act in the<br \/>\nbest way calculated to mitigate and adapt to climate change.<\/p>\n<p>When determining marine licence applications you must, in terms of section 27 of the 2010 Act, have<br \/>\nregard to the need to protect the environment and human health as well as the need to prevent<br \/>\ninterference with legitimate users of the sea (the definition of \u2018sea\u2019 in the 2010 Act includes tidal<br \/>\nwaters of rivers and estuaries) and such other matters as you may consider relevant.<\/p>\n<p>In addition, you must have regard, amongst other things, to the practical availability of any alternative<br \/>\nmethod of taking forward the proposed development as well as having regard to the effects of any use<br \/>\nintended to be made to the project once it has been constructed.<\/p>\n<p>Section 29 of the 2010 Act allows you to consider marine licence applications and to grant licences<br \/>\neither unconditionally or subject to conditions, or to refuse such applications. The conditions that may<br \/>\nbe attached to a licence may, under section 29(2) of the 2010 Act, relate to the activities authorised by<br \/>\nthe licence, precautions to be taken or works to be carried out in connection with the activities and the<br \/>\nmonitoring of the licensed activities. Section 29(3) of the Act sets out some particular conditions that<br \/>\nmay be attached to a licence.<\/p>\n<p>Furthermore, under section 29(6) of the 2010 Act you are not authorised to grant a marine licence to<br \/>\ncarry on any activity which is contrary to international law.<\/p>\n<p><strong>Habitats Directive and Habitats Regulations<\/strong><\/p>\n<p>In terms of the Habitats Directive (article 6) and the Habitats Regulations 1994 (regulation 48(5)) you<br \/>\nmay only agree to the proposal being taken forward only after having ascertained that it will not<br \/>\nadversely affect the integrity of the Natura sites and, if appropriate, after having obtained the opinion<br \/>\nof the general public. In considering whether the proposal will adversely affect the integrity of the<br \/>\nsites you must have regard to the manner in which it is proposed to be carried out.<\/p>\n<p>This is not to say that plans or projects which have been assessed as having negative implications for<br \/>\nsuch sites can never be approved. Proposals can be approved in spite of a negative assessment where<br \/>\nthe project in question must be carried out for imperative reasons of overriding public interest,<br \/>\nincluding those of a social or economic nature. In such cases compensatory measures must be taken<br \/>\nto ensure that the overall coherence of the Natura network of protected sites is protected.<\/p>\n<p><strong>Annex B<\/strong><\/p>\n<p><strong>PROFORMA FOR RECORDING MARINE SCOTLAND\u2019S CONSIDERATION OF A PROPOSAL <\/strong><br \/>\n<strong>AFFECTING A POTENTIAL\/DESIGNATED SAC OR SPA<\/strong><\/p>\n<p>SITE: GSK Tidal Array, River South Esk Estuary, Montrose<\/p>\n<p>FILE REF: FKB\/Z248<\/p>\n<p>Appropriate Assessment \u2013 Conclusion<\/p>\n<p>The location of the proposed development is characteristic in having a unique set of environmental<br \/>\nand geographic conditions that are combined with potentially highly sensitive receptors. In light of<br \/>\nthe assessment Marine Scotland conclude that there is insufficient information to ascertain that the<br \/>\ndevelopment will not have an adverse effect on the integrity of the South Esk SAC, the Firth of Tay<br \/>\nand Eden Estuary SAC and the Montrose Basin SPA.<\/p>\n<p>1a. Name of Natura site affected &amp; current status available from:<\/p>\n<p><a href=\"http:\/\/gateway.snh.gov.uk\/sitelink\/siteinfo.jsp?pa_code=8409\">http:\/\/gateway.snh.gov.uk\/sitelink\/siteinfo.jsp?pa_code=8409<\/a><\/p>\n<p><a href=\"http:\/\/gateway.snh.gov.uk\/sitelink\/siteinfo.jsp?pa_code=8512\">http:\/\/gateway.snh.gov.uk\/sitelink\/siteinfo.jsp?pa_code=8512<\/a><\/p>\n<p>1. River South Esk SAC<\/p>\n<p>2. Firth of Tay and Eden Estuary SAC<\/p>\n<p>3. Montrose Basin SPA<\/p>\n<p>1b. Name of component SSSI if relevant<\/p>\n<p>Not relevant for this assessment<\/p>\n<p>1c. European qualifying interests &amp; whether priority\/non-priority:<\/p>\n<p><strong>1. River South Esk SAC<\/strong><\/p>\n<p>\u2022 Atlantic salmon<\/p>\n<p>\u2022 Freshwater pearl mussel<\/p>\n<p><strong>2. Firth of Tay and Eden Estuary SAC<\/strong><\/p>\n<p>\u2022 Common seal<\/p>\n<p><strong>3. Montrose Basin SPA<\/strong><\/p>\n<p>\u2022 Dunlin (Calidris alpina alpina)*<\/p>\n<p>\u2022 Eider (Somateria mollissima)*<\/p>\n<p>\u2022 Greylag goose (Anser anser)<\/p>\n<p>\u2022 Knot (Calidris canutus)<\/p>\n<p>\u2022 Oystercatcher (Haematopus ostralegus)*<\/p>\n<p>\u2022 Pink-footed goose (Anser brachyrhynchus)<\/p>\n<p>\u2022 Redshank (Tringa totanus)<\/p>\n<p>\u2022 Shelduck (Tadorna tadorna)*<\/p>\n<p>\u2022 Wigeon (Anas penelope)*<\/p>\n<p>\u2022 Waterfowl assemblage<\/p>\n<p>* indicates assemblage qualifier only.<\/p>\n<p>1d. Conservation objectives for qualifying interests:<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Annex II Species Conservation Objectives<\/strong><\/p>\n<p><strong><\/strong><br \/>\n<strong>1. River South Esk SAC<\/strong><\/p>\n<p>To avoid deterioration of the habitats of the qualifying species or significant disturbance to the<br \/>\nqualifying species, thus ensuring that the integrity of the site is maintained and the site makes an<br \/>\nappropriate contribution to achieving favourable conservation status for each of the qualifying<br \/>\nfeatures; and To ensure for the qualifying species that the following are maintained in the long term:<\/p>\n<p>\u2022 Population of the species, including range of genetic types for salmon, as a viable component<br \/>\nof the site<\/p>\n<p>\u2022 Distribution of the species within site<\/p>\n<p>\u2022 Distribution and extent of habitats supporting the species<\/p>\n<p>\u2022 Structure, function and supporting processes of habitats supporting the species<\/p>\n<p>\u2022 No significant disturbance of the species<\/p>\n<p>\u2022 Distribution and viability of freshwater pearl mussel host species<\/p>\n<p>\u2022 Structure, function and supporting processes of habitats supporting freshwater pearl mussel<br \/>\nhost species<\/p>\n<p><strong>2. Firth of Tay and Eden Estuary SAC<\/strong><\/p>\n<p>To avoid deterioration of the habitats of the qualifying species or significant disturbance to the<br \/>\nqualifying species, thus ensuring that the integrity of the site is maintained and the site makes an<br \/>\nappropriate contribution to achieving favourable conservation status for each of the qualifying<br \/>\nfeatures; and<\/p>\n<p>\u2022 To ensure for the qualifying species that the following are maintained in the long term:<\/p>\n<p>\u2022 Population of the species as a viable component of the site<\/p>\n<p>\u2022 Distribution of the species within site<\/p>\n<p>\u2022 Distribution and extent of habitats supporting the species<\/p>\n<p>\u2022 Structure, function and supporting processes of habitats supporting the species<\/p>\n<p>\u2022 No significant disturbance of the species<\/p>\n<p><strong>3. Montrose Basin SPA<\/strong><\/p>\n<p>To avoid deterioration of the habitats of the qualifying species or significant disturbance to the<br \/>\nqualifying species, thus ensuring that the integrity of the site is maintained; and<\/p>\n<p>To ensure for the qualifying species that the following are maintained in the long term:<\/p>\n<p>\u2022 Population of the species as a viable component of the site<\/p>\n<p>\u2022 Distribution of the species within site<\/p>\n<p>\u2022 Distribution and extent of habitats supporting the species<\/p>\n<p>\u2022 Structure, function and supporting processes of habitats supporting the species<\/p>\n<p>\u2022 No significant disturbance of the species<\/p>\n<p><strong>PROPOSAL DETAILS<\/strong><\/p>\n<p>2a. Proposal title &amp; name of consultee (i.e. applicant or competent authority)<\/p>\n<p>GlaxoSmithKline (GSK) Montrose Tidal Array<\/p>\n<p>Marine<br \/>\nScotland<\/p>\n<p>2b. Date of Consultation:<\/p>\n<p>14th May<br \/>\n2012<\/p>\n<p>2c. Type of Case:<\/p>\n<p>Offshore renewable tidal array development<br \/>\n2d. Details of proposed operation (inc. location, timing, methods):<\/p>\n<p>GSK propose to develop a tidal array in the River South Esk Estuary, Montrose. The capacity would<br \/>\nbe up to 0.7MW, comprising 15 tidal turbines with gravity foundations. These would be deployed<br \/>\neither side of the road bridge at Montrose in 2 phases over 14 months. These turbines would transmit<br \/>\nelectricity to the shore with armoured cables where they would connect to a shore station. The power<br \/>\nwould then be transmitted to the GSK Montrose site.<\/p>\n<p>The proposed development is located approximately 4.6 km downstream from The River South Esk<br \/>\nSAC, approximately 32 km north of The Firth of Tay and Eden Estuary SAC and 100 metres from the<br \/>\nMontrose Basin SPA.<\/p>\n<p><strong>ASSESSMENT IN RELATION TO REGULATION 20 or 48<\/strong><\/p>\n<p>3a. Is the operation directly connected with or necessary to conservation management of the<br \/>\nsite? NO If YES give details:<\/p>\n<p>The operation is not connected with or necessary to conservation management of the site.<\/p>\n<p>If yes and it can be demonstrated that the tests in 3b have been applied to all the interest features in<br \/>\na fully assessed and agreed management plan then consent can be issued but rationale must be<br \/>\nprovided, including reference to management objectives. If no, or if site has several European<br \/>\nqualifying interests and operation is not directly connected with or necessary to the management of<br \/>\nall of these then proceed to 3b.<\/p>\n<p>3b. Is the operation likely to have a significant effect on the qualifying interest? Repeat for<br \/>\neach interest on the site.<\/p>\n<p><strong>1. River South Esk SAC<\/strong><\/p>\n<p>During the consultation phase SNH advised that the development would be likely to have a<br \/>\nsignificant effect (LSE) on Atlantic Salmon and Freshwater Pearl Mussel (FWPM) from the South<br \/>\nEsk SAC. This is due to:<\/p>\n<p>\u2022 the potential for collision risk and barrier effect from the array during operation.<\/p>\n<p>\u2022 disturbance during installation.<\/p>\n<p>\u2022 potential disturbance and injury from electromagnetic fields (EMF), noise, water pressure<br \/>\nchange and cavitation effects.<\/p>\n<p>\u2022 potential changes to sedimentation patterns, tidal height and flushing within the Montrose<br \/>\nBasin caused by the operational turbines which may have a direct effect on the distribution,<br \/>\nextent, structure, function and supporting processes of habitats supporting the qualifying<br \/>\nfeature, and an indirect effect on the maintenance of the populations as a viable component<br \/>\nof the SAC.<\/p>\n<p>FWPM rely on Atlantic Salmon as a host species during the larval stage of their reproduction,<br \/>\ntherefore any impacts on Atlantic Salmon may have an impact on FWPM.<\/p>\n<p><strong>2. Firth of Tay and Eden Estuary SAC<\/strong><\/p>\n<p>It has not been established in the Environmental Statement whether the common seals using the<br \/>\nMontrose Basin haul out are connected with the SAC. Due to a lack of scientific evidence a<br \/>\nprecautionary approach assumes that there is connectivity. SMRU have data from 12 tagged seals<br \/>\nfrom the SAC, one of which visited Montrose during the breeding season.<\/p>\n<p>LSE on Common Seals from the Firth of Tay and Eden Estuary SAC was therefore identified due to:<\/p>\n<p>\u2022 potential for disturbance during installation, maintenance and decommissioning.<\/p>\n<p>\u2022 potential for collision risk or disturbance\/displacement during turbine operation.<\/p>\n<p>\u2022 potential for barrier effect from the presence of turbines in the water column.<\/p>\n<p>\u2022 potential changes to sedimentation patterns, tidal height and flushing within the Montrose<\/p>\n<p>Basin caused by the operational turbines which may have a direct effect on the distribution,<br \/>\nextent, structure, function and supporting processes of habitats supporting the qualifying<br \/>\nfeature, and an indirect effect on the maintenance of the populations as a viable component<br \/>\nof the SAC.<\/p>\n<p>\u2022 potential from \u201ccorkscrew\u201d injury caused by vessels with ducted propellers during installation,<br \/>\nmaintenance and decommissioning.<\/p>\n<p><strong>3. Montrose Basin SPA<\/strong><\/p>\n<p>Montrose Basin SPA is classified for its aggregation of non-breeding birds. It is also classified as a<br \/>\nRamsar site for its estuarine habitats and wintering waterfowl. In Scotland it is a matter of policy as<br \/>\nset out in February 2010 Scottish Planning Policy that International Ramsar sites are also Natura<br \/>\nsites and\/ or Sites of Special Scientific Interest and are protected under the relevant statutory<br \/>\nregimes. Therefore where the bird interests of the Montrose Basin Ramsar site correspond with<br \/>\nthose of an overlapping SPA there is no need to consider them separately.<\/p>\n<p>LSE on all the qualifying features of the Montrose Basin SPA was identified due to:<\/p>\n<p>\u2022 potential changes to sedimentation patterns, tidal height and flushing within the Montrose<br \/>\nBasin caused by the operational turbines which may have a direct effect on the distribution,<br \/>\nextent, structure, function and supporting processes of habitats supporting the qualifying<br \/>\nfeatures, and an indirect effect on the maintenance of the species populations as a viable<br \/>\ncomponent of the SPA.<\/p>\n<p>LSE on Eider ducks from the Montrose Basin SPA was identified due to:<\/p>\n<p>\u2022 potential for disturbance during installation and operation<\/p>\n<p>\u2022 potential for collision risk during turbine operation<br \/>\n3c. Appropriate assessment of the implications for the site in view of the site\u2019s conservation objectives.<\/p>\n<p>i) Describe for each European qualifying interest the potential impacts of the proposed operation detailing which<br \/>\naspects of the proposal could impact upon them.<\/p>\n<p>ii) Evaluate the significance of the potential impacts, e.g. whether short\/long term, reversible or irreversible,<br \/>\nand in relation to the proportion\/importance of the interest affected, and the overall effect on the site\u2019s<br \/>\nconservation objectives. Record if additional survey information or specialist advice has been obtained.<\/p>\n<p><strong>1. River South Esk SAC<\/strong><\/p>\n<p>SNH concluded that on the basis of the information presented in the Environmental Statement it<br \/>\ncould not be ascertained that there would be no adverse effect on site integrity due to a lack of<br \/>\ndata on both the behaviour of salmon in the Montrose channel and the interaction of these fish<br \/>\nwith the proposed turbines. Furthermore they considered that it would be unlikely that the applicant<br \/>\nwould be able to gather sufficiently robust data to further inform our understanding regarding the<br \/>\npotential for an adverse effect on site integrity.<\/p>\n<p>The response to the consultation received on the 23rd April 2012 from Marine Scotland Science<br \/>\nFreshwater Fish Laboratory (MSS FFL) stated that there are concerns over the health of the early<br \/>\nrunning salmon stocks and that these stocks would have a very limited capacity to absorb<br \/>\nadditional mortality associated with new anthropogenic activity. There was insufficient information<br \/>\nin the ES to assess the impacts of the turbines on salmon.<\/p>\n<p><strong>In May 2012 Marine Scotland received 2 documents from GSK :<\/strong><\/p>\n<p>1. \u201cGSK Montrose tidal project proposed fish monitoring\u201d which gave details of proposed<br \/>\nmonitoring which it was thought would fill the information gaps in the ES and provide enough<br \/>\ninformation to assess the impact of the turbines on the salmon from the South Esk SAC.<\/p>\n<p>2. \u201cPreliminary summary of Montrose split beam sonar testing\u201d which gave data from a 2 day trial<br \/>\nof the split beam sonar system proposed as a fish monitoring method.<\/p>\n<p>These documents were passed on to SNH and MSS FFL. In response SNH advised that the<br \/>\nproposed monitoring work would be unlikely to provide sufficiently robust data to allow Marine<br \/>\nScotland to conclude no adverse effect on site integrity.<\/p>\n<p>MSS FFL detailed many problems with the proposed monitoring including:<\/p>\n<p>\u2022 Sampling effort (72 hours per month) likely to be inadequate to capture fish movements if<br \/>\nthese are strongly temporally aggregated<\/p>\n<p>\u2022 The ability of the equipment to distinguish between species of fish and size would be<br \/>\nalmost nil<\/p>\n<p>\u2022 The equipment would be unlikely to detect smolts<\/p>\n<p>GSK arranged for RPS to conduct a review of the Environmental Statement. This was presented to<br \/>\nMarine Scotland on the 5th November 2012 GSK . Although this review identified many of the<br \/>\nshortcomings of the original ES it did not provide the confidence that the applicant would be able<br \/>\nto collect the information required to conclude that there would be no adverse impact on site<br \/>\nintegrity due to the sites unfavourable status and its very limited capacity to withstand additional<br \/>\nsalmon mortality.<\/p>\n<p><strong>2. Firth of Tay and Eden Estuary SAC<\/strong><\/p>\n<p>SNH concluded that there was insufficient information in the Environmental Statement to conclude<br \/>\nno adverse effect on the integrity of the site. The collision risk modelling results in the ES predicted<br \/>\n6.9 seal collisions per year for the 15 turbines. Although this figure is precautionary, it raises<br \/>\nserious concerns considering that the current status of the qualifying feature is unfavourable<br \/>\ndeclining and the Potential Biological Removal (PBR) for common seals in the East Coast<br \/>\nManagement area is only 3 individuals for the year. Although an active sonar and shut-down was<br \/>\nproposed as mitigation, minimal information was provided in the ES.<\/p>\n<p>SNH concluded that in order to inform an appropriate assessment a detailed assessment of the<br \/>\nactive sonar and shut-down procedure would be required along with further modelling of the<br \/>\ncoastal processes and an assessment of how any changes may have a potential impact on the<br \/>\nqualifying feature and their conservation objectives.<\/p>\n<p><strong>3. Montrose Basin SPA<\/strong><\/p>\n<p>SNH concluded that there was insufficient information in the Environmental Statement to conclude<br \/>\nno adverse effect on the integrity of the site. SNH advised that order to inform an appropriate<br \/>\nassessment a revised collision risk model would be required along with further modelling of the<br \/>\ncoastal processes and an assessment of how any changes may have a potential impact on the<br \/>\nqualifying feature and their conservation objectives.<\/p>\n<p>It is believed that additional surveys, data analysis and modelling work suggested in the RPS<br \/>\nreview of the Environmental Statement would provide Marine Scotland with sufficient information<br \/>\nto complete an appropriate assessment. However as this additional survey work and analysis has<br \/>\nnot been carried out in order to inform this appropriate assessment, it is concluded based on the<br \/>\ninformation presented to date, that there is insufficient evidence to be able to conclude no adverse<br \/>\neffect on site integrity.<\/p>\n<p>iii) In the light of the assessment, ascertain whether the proposal will not adversely affect the integrity<br \/>\nof the site for the European interests. Separate conclusions must be provided if the SAC and\/or SPA<br \/>\nand\/or Ramsar site. If conditions required, proceed to 3d.<\/p>\n<p><strong>Appropriate Assessment<\/strong><\/p>\n<p>The location is characteristic in having a unique set of environmental and geographic conditions that<br \/>\nare combined with potentially highly sensitive receptors. In light of the assessment Marine Scotland<br \/>\nconclude that there is insufficient information to ascertain that the development will not have an<br \/>\nadverse effect on the integrity of the South Esk SAC, the Firth of Tay and Eden Estuary SAC and<br \/>\nthe Montrose Basin SPA.<br \/>\n<strong>4. RESPONSE<\/strong><\/p>\n<p><strong>a) Marine Scotland Comments<\/strong><\/p>\n<p><strong>For Marine Scotland advice to other authorities:<\/strong><\/p>\n<p>The development proposed by GSK for the deployment of 15 tidal turbines in the River South Esk<br \/>\nEstuary, Montrose may have an adverse impact on the integrity of South Esk SAC, the Firth of Tay<br \/>\nand Eden Estuary SAC and the Montrose Basin SPA.<\/p>\n<p><strong>For Marine Scotland response to request for opinion on effects of permitted development<\/strong>:<\/p>\n<p>The development may have an adverse impact on the integrity of South Esk SAC, the Firth of Tay<br \/>\nand Eden Estuary SAC and the Montrose Basin SPA.<\/p>\n<p><strong>For Marine Scotland response to application:<\/strong><\/p>\n<p>Under section 48 of The Conservation (Natural Habitats &amp;c.) Regulations 1994 as amended Marine<br \/>\nScotland as the Competent Authority must reject the application.<\/p>\n<p>&nbsp;<\/p>\n<p>Name of assessor<\/p>\n<p>Gayle Holland<\/p>\n<p>Date : 26th November 2012<\/p>\n<p>&nbsp;<\/p>\n<p>GAME, SET &amp; MATCH\u00a0TO COMMON SENSE I WOULD SAY! NICE THAT ON THIS OCCASION THE SCIENCE FULLY SUPPORTS THE ORDINARY MAN&#8217;S GUT FEELING!<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>These bulletin blogs represent news about Finavon and the South Esk, and my views as a riparian owner. While I may digress at times to write about other places, these are not the views of any other organisation, nor are they designed to promote the interests of any individual or organisation other than Finavon Castle &hellip; <a href=\"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/?p=4274\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Montrose Turbine Application Rejected&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,7,4,3],"tags":[],"class_list":["post-4274","post","type-post","status-publish","format-standard","hentry","category-habitat-improvements","category-river-report","category-salmon","category-sea-trout"],"_links":{"self":[{"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/posts\/4274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4274"}],"version-history":[{"count":9,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/posts\/4274\/revisions"}],"predecessor-version":[{"id":4282,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=\/wp\/v2\/posts\/4274\/revisions\/4282"}],"wp:attachment":[{"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.finavoncastlefishing.co.uk\/bulletin\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}